⚠ IDLH EXCEEDED — 300 PPM — ABANDON AREA — SCBA REQUIRED ⚠
CARGO SYSTEM


Machinery Control

Valve Status (IGC Ch.19)

Reliquefaction Plant
RUNNING — 18%

Cargo Flow
0.0 t/h
MANIFOLD ISOLATION
P&ID — NH₃ CARGO TANKER (IGC CODE CH.19)
ALARM MANAGEMENT SYSTEM
ESD closes all valves per IGC §17.4 — click alarm to ACK
GAS DETECTION — NH₃ PPM (IDLH: 300 ppm)
SCENARIO / TREND MONITOR
AWAITING SCENARIO
Select a training scenario to begin simulation.
PPE STATUS / SAFETY SYSTEMS
SCBA SETS
6/6
READY
CHEM SUITS
6/6
READY
Safe Haven Status

Water Curtain / Deck Deluge

Inert Gas System
N₂ INERT — O₂: 2.1%
Tank void spaces — IGC §5.5
CARGO PIPELINES — P&ID
PIPELINE LINEUP
SHIP-TO-SHORE MANIFOLD — CARGO CONNECTION
MANIFOLD CONTROLS
NH₃ CARGO TANKS — PRISMATIC TYPE-C · −33°C REFRIGERATED
PUMP & TANK CONTROLS
INSULATION MONITORING — TANK SPACES & VOID SPACES
FIXED NH₃ GAS DETECTION SYSTEM
DETECTOR CONTROLS
PORTABLE GAS DETECTION INSTRUMENTS
RELIQUEFACTION PLANT — CARGO VAPOUR RETURN
RELIQ CONTROLS
NH₃ SCRUBBER / ABSORBER SYSTEM
SCRUBBER CONTROLS
NITROGEN GENERATION & SUPPLY
N₂ CONTROLS
NITROGEN DISTRIBUTION — INERTING, PURGING & PADDING
SHORE PIPELINES — LOADING / DISCHARGE ARMS
SHORE PIPELINE CONTROLS
SHORE NH₃ STORAGE TANK — TERMINAL FACILITY
SHORE EQUIPMENT OVERVIEW
EQUIPMENT CONTROLS

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.