STABILITY — TRIM · LIST · GM
METACENTRIC HEIGHT (GM)
2.4 m
TRIM (FWD – AFT)
0.4 m
LIST
0.2 °

Draft FWD8.4m
Draft AFT8.8m
Bending Moment42%
Shear Force38%

Ballast Pumps
Ballast Tank Valves

Bilge Pumps

PIPELINE COMPONENTS
DECK PLAN — 9 CARGO HOLDS — CAPESIZE 180,000 DWT
ALARM MANAGEMENT SYSTEM
IMSBC Code 2022 · SOLAS XII Flooding Detection
Hold Ventilation
⛶ PIPELINE LINE-UP
CARGO HOLDS — 9 HOLDS — HATCH STATUS

Hatch Cover Hydraulics

Cargo — Iron Ore (Group A)
Cargo Moisture8.2%
TML12.0%
LIQUEFACTION RISK: NONE
SCENARIO / TREND — DRAFT AFT
NORMAL LOADING — IRON ORE
Sequenced loading per loading plan. Monitoring stability, trim and structural stress limits.
HOLD MONITORING — GAS / MOISTURE / BILGE

Hold Bilge Levels

Loading Rate
Loading Rate0t/h
Total Loaded0t

Hold Inspection Status

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.