VOYAGE PHASE:
CARGO / IG SYSTEM
IG DECK PRESS +60 mmWG
IG O₂ CONTENT 2.8 %


Cargo Pumps (3 × 4000 m³/h)
Valves

Discharge / Loading Rate
0 m³/h

COW — Crude Oil Washing
INACTIVE
ISGOTT §11 — washing pressure 8-10 bar
MANIFOLD ISOLATION
P&ID — VLCC CRUDE OIL TANKER (TOP-DECK VIEW)
ALARM MANAGEMENT
ESD closes all cargo valves — IGC/SOLAS II-2. Click alarm to ACK.
⛶ PIPELINE LINE-UP
TANK LEVELS — 14 CARGO TANKS

Ballast / Trim
FWD DRAFT
18.2 m
AFT DRAFT
18.5 m
TRIM
0.3 m AFT
LIST
0.0°
SCENARIO / TREND
AWAITING SCENARIO
Select a training scenario to begin.
BALLAST / FIRE / IG
Ballast Pumps
IG System
P/V Valves (auto)
ALL P/V: CLOSED

Fire Detection Zones

COW Progress
Coverage 0%
COW machine: STOPPED | Pressure: — bar

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.