IG SYSTEM STATUS
IG DECK PRESS +60 mmWG
IG O₂ CONTENT 2.8 %


Cargo Flow Rate
0 m³/h

Stability
FWD DRAFT
18.20 m
AFT DRAFT
18.50 m
TRIM
0.30 m AFT
LIST
0.0°
VLCC CARGO SYSTEM — TOP-DECK OVERVIEW
ALARM MANAGEMENT
ESD closes all cargo valves — SOLAS II-2. Click alarm to ACK.
TANK LEVELS — 14 CARGO TANKS
SCENARIO / CHECKLIST
AWAITING SCENARIO
Select a training scenario to begin.
GAS DETECTION — HC %LEL

COW Progress
Coverage 0%
COW: STOPPED | Pressure: — bar
CARGO PIPELINES — P&ID (CARGO MAIN · STRIPPING · SLOP · COW LINES)
PIPELINE LINE-UP
MANIFOLD — SHIP-TO-SHORE · HOSE CONNECTIONS · LINE BLANKS · REDUCERS
MANIFOLD CONTROLS
CARGO TANK FARM — VLCC 14-TANK ARRANGEMENT
TANK DETAILS
INERT GAS SYSTEM — IG PLANT · DECK SEAL · P/V VALVES · DECK MAIN
IG CONTROLS
GAS DETECTION — FIXED HC DETECTORS (%LEL) · DETECTOR LOCATIONS
DETECTOR CONTROLS
PORTABLE GAS DETECTION INSTRUMENTS
CRUDE OIL WASHING — COW MACHINES · DRIVE UNITS · TANK CLEANING PROGRAM
COW CONTROLS
BALLAST SYSTEM — SEGREGATED BALLAST TANKS · PUMPS · VALVES
BALLAST CONTROLS
CARGO PUMPS — MAIN PUMPS · STRIPPING PUMP · PERFORMANCE CURVES
PUMP CONTROLS
ODME — OIL DISCHARGE MONITORING EQUIPMENT · OVERBOARD VALVE
ODME CONTROLS
SHORE PIPELINES · SHORE TANK
SHORE CONTROLS

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.