CARGO TANK STATUS

Cargo Type
PROPANE · C₃H₈ · −42°C

Reliquefaction Plant
OFF

Tank Fill Level
0.0 %
P&ID SCHEMATIC — LPG CARGO SYSTEM (VLGC 84,000 m³)
ALARM MANAGEMENT — IGC CODE §13
Per IGC Code §16 — ESD closes all cargo valves and stops pumps
GAS DETECTION — %LEL (FLOOR LEVEL DETECTORS)
OPERATIONAL PHASE
NORMAL OPERATIONS — LADEN SEA PASSAGE
All systems nominal. Reliquefaction managing BOG.
SAFETY STATUS / TANK SUMMARY

Hold Space Status
O₂: 0.5% · HC: 0.0%LEL · INERTED

Cargo Operations Mode
CARGO PIPELINES — P&ID (LIQUID / VAPOUR HEADERS)
PIPELINE LINEUP
CARGO MANIFOLD — SHIP-TO-SHORE CONNECTION
MANIFOLD CONTROLS
CARGO TANK — CROSS SECTION WITH PUMP SYSTEMS
PUMP & TANK CONTROLS
TEMPERATURE MONITORING — INSULATION & INTERBARRIER SPACE
FIXED GAS DETECTION SYSTEM — %LEL (FLOOR LEVEL)
DETECTOR CONTROLS
PORTABLE GAS DETECTION INSTRUMENTS
RELIQUEFACTION PLANT — CASCADE CYCLE
RELIQ CONTROLS
CARGO COMPRESSORS — HD / LD
COMPRESSOR CONTROLS
CARGO HEATER / VAPORISER — STEAM SUPPLY
HEATER CONTROLS
NITROGEN GENERATION & SUPPLY
N₂ CONTROLS
NITROGEN DISTRIBUTION — HOLD SPACE INERTING & PURGE
SHORE PIPELINES — SPOOL PIECES & LOADING ARMS
SHORE PIPELINE CONTROLS
SHORE STORAGE TANK — REFRIGERATED / PRESSURISED
SHORE EQUIPMENT OVERVIEW
SHORE EQUIPMENT CONTROLS

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.