⚡ BLACKOUT — ALL MAIN POWER LOST — START EMERGENCY GENERATOR — RESTORE POWER ⚡
POWER GENERATION
Main Bus Voltage
MAIN BUS A440 V / 60 Hz
MAIN BUS BDEAD
EMERG BUSDEAD

Diesel Generator No.1
DG-1 · 1500 kW · 440 V ONLINE
Load
850 kW
Load %
57%
Voltage
440 V
Freq
60.0 Hz
Current
1113 A
P.F.
0.93
Diesel Generator No.2
DG-2 · 1500 kW · 440 V STANDBY
Load
— kW
Load %
—%
Voltage
— V
Freq
— Hz
Current
— A
P.F.
Bus Tie Breaker
Paralleling A and B bus — check sync before closing
SINGLE LINE DIAGRAM — MAIN SWITCHBOARD (MSB)
ALARM MANAGEMENT SYSTEM
Blackout: all main power lost · E/G auto-start required
CLICK ALARM TO ACKNOWLEDGE
LOAD MANAGEMENT — TOTAL LOAD
BUS A LOAD
850 kW
BUS B LOAD
0 kW
TOTAL
850 kW
SCENARIO
NORMAL OPERATIONS
DG-1 online feeding Bus A. DG-2 on standby. Loads within limits. Monitor insulation resistance and load balance.
EARTH FAULT DETECTION (IEC 60092)
INSULATION MONITOR
HEALTHY
IT system — resistance to earth
Insulation Resistance (MΩ)

Earth Fault Locator
No fault detected

System Notes (IEC 60092-302)
Ships use IT (Isolated Terra) earthing system. First earth fault does not trip supply but must be located. Second earth fault causes short circuit — find first fault quickly.
DIESEL GENERATORS — DETAIL VIEW
GENERATOR CONTROLS
DG-1 — 1500 kW · 440 V · 60 Hz
StatusONLINE
Load850 kW
Load %57%
Voltage440 V
Frequency60.0 Hz
Current1113 A
Power Factor0.93
Oil Pressure4.2 bar
Coolant Temp78 °C
Run Hours4842 h
DG-2 — 1500 kW · 440 V · 60 Hz
StatusSTANDBY
Load— kW
Load %—%
Voltage— V
Frequency— Hz
Current— A
Power Factor
Oil Pressure— bar
Coolant Temp— °C
Run Hours3201 h
MAIN SWITCHBOARD — SINGLE LINE DIAGRAM
MSB PANEL LINEUP
INCOMING BREAKERS
DG-1 Incoming ACB
DG-2 Incoming ACB
Shore Power ACB
BUS A — FEEDER BREAKERS
Propulsion Motor 1
Bow Thruster
Cargo Cranes
HVAC Compressors
Fire Pumps (Ess)
BUS B — FEEDER BREAKERS
Propulsion Motor 2
Steering Gear 1
Steering Gear 2
Ballast Pumps
BUS TIE — PARALLELING & SYNCHRONISING
BUS TIE CONTROLS
SYNCHRONISING CHECK
Bus A Voltage440 V
Bus B Voltage— V
Voltage Diff
Bus A Freq60.0 Hz
Bus B Freq— Hz
Freq Diff
Phase Angle
Sync StatusNOT READY
BUS TIE BREAKER
Closes Bus A to Bus B. Both buses share all load. Only close when buses are in sync (ΔV <5%, Δf <0.2 Hz, Δφ <10°).
OPERATING MODES
Split bus preferred for fault containment. Parallel required when transferring load between generators.
LOAD MANAGEMENT — LOAD SHARING & PRIORITISATION
LOAD CONTROLS
TOTAL LOAD SUMMARY
Bus A Load850 kW
Bus A Capacity1500 kW
Bus A Margin43%

Bus B Load0 kW
Bus B Capacity1500 kW

Total System850 kW
PREFERENTIAL TRIP — PRIORITY ORDER
Non-essential loads trip first to preserve essential services when load exceeds generator capacity.
P1 ESSNavigation Equipment
P1 ESSFire Pumps
P1 ESSSteering Gear
P2 PREFHVAC Compressors
P2 PREFBallast Pumps
P3Cargo Cranes
P3Galley Equipment
P4 NONBow Thruster
LOAD SHEDDING
EARTH FAULT DETECTION — IEC 60092-302 IT SYSTEM
INSULATION MONITOR
SYSTEM STATUS
INSULATION MONITOR — MAIN BUS
HEALTHY
IT system — resistance to earth
Bus A Insulation∞ MΩ
Bus B Insulation∞ MΩ
Alarm Threshold50 kΩ
FEEDER INSULATION (MΩ)
FAULT LOCATOR
No fault detected
First earth fault: alarm only — system remains live. Locate and isolate before second fault. Second fault: phase-to-phase via earth — likely blackout.
LOCATOR CONTROLS
PROTECTION RELAY — OVERCURRENT & DIFFERENTIAL
RELAY SETTINGS & STATUS
OVERCURRENT — BUS A
Pickup Current1200 A
Trip Delay0.5 s
Instantaneous8× In
Relay StatusARMED
OVERCURRENT — BUS B
Pickup Current1200 A
Trip Delay0.5 s
Relay StatusARMED
REVERSE POWER — DG1
Trip Setting−5% rated
Delay3 s
StatusARMED
REVERSE POWER — DG2
Trip Setting−5% rated
StatusARMED
UNDERVOLTAGE
Pickup85% Un
Trip Delay1.5 s
StatusARMED
TRIP LOG
No trips recorded.
EMERGENCY GENERATOR — SOLAS Ch.II-1 Reg.43
EMERGENCY GEN CONTROLS
E/G — 250 kW · 440 V · 60 Hz
StatusSTANDBY
Load— kW
Voltage— V
Frequency— Hz
Current— A
Fuel Level87%
Battery Charge100%
Last Test7 days ago
START / STOP
ESSENTIAL SERVICES — AUTO RESTORE
On blackout, E/G auto-starts within 30 s (SOLAS Reg.43). Feeds emergency switchboard only.
Navigation Lights
Steering Gear
Fire Detection
Radio / GMDSS
Emergency Lighting
UPS — UNINTERRUPTIBLE POWER SUPPLY SYSTEMS
UPS STATUS & CONTROLS
UPS-1 — BRIDGE SYSTEMS · 10 kVA
ModeONLINE
Input Voltage440 V
Output Voltage230 V
Battery SOC98%
Load3.2 kVA
Autonomy18 min
StatusHEALTHY
UPS-2 — ENGINE ROOM · 5 kVA
ModeONLINE
Input Voltage440 V
Output Voltage230 V
Battery SOC95%
Load1.8 kVA
Autonomy22 min
StatusHEALTHY
UPS-3 — CARGO CONTROL · 5 kVA
ModeONLINE
Battery SOC92%
Load2.1 kVA
StatusHEALTHY
BATTERY TEST
SHORE POWER CHANGEOVER — COLD IRONING
SHORE POWER CONTROLS
SHORE SUPPLY STATUS
Shore Voltage— V
Shore Frequency— Hz
Shore AvailableNO
Phase Sequence
Shore CBOPEN
SYNCHRONISING CHECK
Ship Bus Voltage440 V
Voltage Match
Freq Match
Ready to CloseNO
CHANGEOVER PROCEDURE
1. Confirm shore supply available
2. Check voltage and phase match
3. Close shore power breaker
4. Transfer load to shore
5. Open DG breakers in sequence
6. Stop generators (if cold ironing)

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.