FUEL CELL STACKS
STACK 1 — PEM 200kW STANDBY
0 kW
Voltage0V
Temp25°C
Stack Health:
95.0%
STACK 2 — PEM 200kW STANDBY
0 kW
Voltage0V
Temp25°C
Stack Health:
92.0%
SYSTEM SCHEMATIC — FUEL CELL POWER TRAIN
H₂ SUPPLY 2.5 bar STACK 1 PEM 200kW 0 kW STANDBY STACK 2 PEM 200kW 0 kW STANDBY H₂O H₂O DC/DC CONV DC BUS DC/DC CONV DC BUS INVERTER DC → AC 0 kW AC 440V / 50Hz SHIP POWER BUS COOLING IN: 60°C OUT: 72°C H₂ DET: 0.0%LEL H₂O OUT: 0.0 L/h
ENVIRONMENTAL METRICS
CO₂ Emissions:0.00 g/kWh
Water Output:0.0 L/h
H₂ Consumed:0.0 kg/h
Total Runtime:00:00:00
ALARM MANAGEMENT SYSTEM
Per SOLAS II-1/D — ESD activates fuel isolation and stack shutdown
ANo active alarms
POWER OUTPUT
0 kW
of 400 kW rated

System Summary
Stack 1: STANDBY
Stack 2: STANDBY
H₂ Press: 2.50 bar
Ship Bus: OFFLINE
POWER OUTPUT TREND
SCENARIO / OPERATIONS LOG
NORMAL OPERATIONS
All systems nominal. Select scenario to begin.
--:--:--System ready. Select scenario.
FUEL CELL STACK — CELL-LEVEL MONITORING
STACK CONTROLS
STACK 1 — PEM 200kW
Output Power0 kW
Stack Voltage0 V
Stack Current0 A
Cell Temp25 °C
Efficiency0 %
Health95.0 %
1. Pre-check
2. Purge
3. Conditioning
4. Ramp-up
5. Full Power
STACK 2 — PEM 200kW
Output Power0 kW
Stack Voltage0 V
Stack Current0 A
Cell Temp25 °C
Efficiency0 %
Health92.0 %
1. Pre-check
2. Purge
3. Conditioning
4. Ramp-up
5. Full Power
STACK ACTIONS
PEM ELECTROCHEMISTRY
Anode: H₂ → 2H⁺ + 2e⁻
Cathode: ½O₂ + 2H⁺ + 2e⁻ → H₂O
Net: H₂ + ½O₂ → H₂O + Power + Heat
Efficiency: ~55% electrical (LHV)
Rated: 200 kW per stack · 400 kW total
H₂ FUEL SUPPLY — P&ID
FUEL SUPPLY CONTROLS
HYDROGEN SUPPLY
Supply Pressure2.50 bar
Flow Rate0.0 kg/h
H₂ Purity99.97 %
Supply Temp20 °C
PRESSURE REGULATION
PRV Set Point5.0 bar
Regulator Out2.50 bar
Low Alarm1.5 bar
ESD Trip0.8 bar
FUEL VALVES
Master Fuel Valve
Stack 1 Isolation
Stack 2 Isolation
Purge Valve
H₂ TANK / CYLINDER BANK
Storage Pressure350 bar
Usable Capacity87 %
Remaining H₂174 kg
Est. Endurance-- h
AIR SUPPLY SYSTEM — CATHODE FEED
AIR SUPPLY CONTROLS
AIR COMPRESSORS
Compressor 1ONLINE
Compressor 2STANDBY
Discharge Press1.8 bar
Inlet Flow0.0 kg/s
AIR QUALITY
Inlet Temp20 °C
Relative Humidity60 %
Filter ΔP0.05 bar
O₂ Content20.9 %
CATHODE EXHAUST
Exhaust Temp-- °C
Exhaust Humidity-- %
H₂O Recovery0.0 L/h
COMPRESSOR CONTROLS
COOLING SYSTEM — THERMAL MANAGEMENT
COOLING CONTROLS
COOLANT TEMPERATURES
Coolant In Temp60 °C
Coolant Out Temp72 °C
ΔT (Stack)12 °C
HEX Efficiency-- %
COOLANT PUMPS
Pump 1RUNNING
Pump 2STANDBY
Flow Rate0 L/min
System Pressure1.2 bar
HEAT EXCHANGER
SW Inlet Temp28 °C
SW Outlet Temp35 °C
SW Flow Rate-- L/min
Fouling Factor0.12
TEMPERATURE ALARMS
High Temp Warn75 °C
High Temp Trip80 °C
Low Flow Alarm30 L/min
PUMP CONTROLS
WATER MANAGEMENT — MEMBRANE HUMIDIFICATION
WATER MANAGEMENT CONTROLS
MEMBRANE HUMIDITY
Stack 1 RH-- %
Stack 2 RH-- %
Target RH85 %
Min Alarm RH70 %
WATER PRODUCTION
Stack 1 Output0.0 L/h
Stack 2 Output0.0 L/h
Total Water0.0 L/h
Accum. Volume0.0 L
HUMIDIFIER
Humidifier 1AUTO
Humidifier 2AUTO
Drain ValveCLOSED
Water Tank Level-- %
DRAIN CONTROLS
POWER CONDITIONING — DC/DC CONVERTERS & INVERTER
ELECTRICAL CONTROLS
DC BUS — STACK 1
DC Voltage0 V
DC Current0 A
DC Power0 kW
Converter Eff.-- %
DC BUS — STACK 2
DC Voltage0 V
DC Current0 A
DC Power0 kW
Converter Eff.-- %
INVERTER — DC/AC
Output Voltage440 V
Frequency50 Hz
Total AC Power0 kW
Power Factor0.98
Inverter Eff.-- %
SHIP POWER BUS
Bus Voltage440 V
Bus StatusOFFLINE
Grid Sync--
Shore PowerOFFLINE
LOAD MANAGEMENT
Load Set Point
Load %0 %
H₂ GAS DETECTION SYSTEM — FIXED DETECTORS
GAS DETECTION CONTROLS
DETECTOR READINGS — % LEL
Stack Room0.0 % LEL
Fuel Prep Room0.0 % LEL
H₂ Tank Bay0.0 % LEL
Compressor Room0.0 % LEL
Deck (Topside)0.0 % LEL
ALARM THRESHOLDS (H₂)
Level 1 Alarm20 % LEL
Level 2 / ESD40 % LEL
Combustion Range4 – 75 % vol
DETECTOR STATUS
Det-1 (Stack Room)NORMAL
Det-2 (Fuel Prep)NORMAL
Det-3 (Tank Bay)NORMAL
Det-4 (Comp Room)NORMAL
Det-5 (Deck)NORMAL
DETECTION ACTIONS
BALANCE OF PLANT — AUXILIARY SYSTEMS
BOP CONTROLS
VENTILATION
Stack Room Fan 1RUNNING
Stack Room Fan 2STANDBY
Air Changes / Hr-- ACH
Exhaust FanRUNNING
CONTROL POWER
UPS StatusMAINS
Battery SOC95 %
24V DC Bus24.1 V
Control PowerNORMAL
MISCELLANEOUS
Stack Room Temp-- °C
Nitrogen PurgeREADY
Fire SuppressionARMED
Bilge LevelLOW
BOP ACTIONS
SHORE CONNECTION — H₂ BUNKERING & POWER INTERFACE
SHORE CONTROLS
H₂ BUNKERING CONNECTION
Coupling StatusDISCONNECTED
Shore Supply Press-- bar
Transfer Rate-- kg/h
Bunkering ModeINACTIVE
SHORE POWER
Shore PowerOFFLINE
Shore Voltage-- V
Shore Frequency-- Hz
BreakerOPEN
BUNKERING CHECKLIST
01. Pre-transfer inspection
02. Coupling connected / tested
03. ESD link verified
04. Purge line with N₂
05. Pressure test complete
06. Transfer in progress
07. Close & vent residuals
08. Disconnect coupling
BUNKERING ACTIONS

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.