CONTROLS
PORT RESTRICTION ACTIVE
MARPOL ANNEX V — INCINERATION PROHIBITED IN PORT
Combustion System
Valves

Sludge Flow Setpoint
0 kg/h
PIPELINE COMPONENTS

P&ID SCHEMATIC — INCINERATOR OG 200C
PRIMARY CHAMBER 🔥 --- °C SECONDARY CHAMBER --- °C TARGET >900°C AFTERBURNER STACK ---°C SLUDGE OIL TANK 75% SLUDGE OIL COMB AIR FAN STOP COMB AIR COOLING WATER --°C WASTE FEED CLOSED TEMP HOLD MARPOL ANNEX V — ANNEX I — IMO MEPC.76(40) PRIMARY CHAMBER: 850–1000°C | SECONDARY: >900°C | FLUE MAX: 350°C TI-101 TI-102 TI-103
GAUGES & ALARMS
PRI CHAMBER---°C
SEC CHAMBER---°C
FLUE GAS TEMP---°C
SLUDGE FLOW0.0kg/h
COMB AIR FLOW0%
COOLING WATER--°C
SLUDGE PRESS0.0bar

ACTIVE ALARMS
SYSNo active alarms
PIPELINE LINEUP
SLUDGE OIL INLETCLOSED
ATOMISING AIRCLOSED
COOLING WATERCLOSED
FLUE DAMPERCLOSED
AIR FANSTOPPED
SWC BURNEROFF
OWC BURNEROFF
VESSEL POSITIONAT SEA
OPERATION LOG & GARBAGE RECORD BOOK
--:--:-- System initialised. Awaiting scenario selection.
CHECKLIST & GRB
MARPOL ANNEX V — GARBAGE RECORD BOOK
No GRB entries yet.
LOG WASTE ENTRY
0.5

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.