SYSTEM STATUS
BILGE PUMP

OCM READING
EFFLUENT OIL CONTENT
0.0
ppm
015 ppm25

3-WAY VALVE
OVERBOARD
Auto-divert active if >15 ppm

TOTAL DISCHARGED
0.000 m³

OWS SYSTEM OVERVIEW — P&ID SCHEMATIC
BILGE HOLDING TANK 0% BP OWS UNIT GRAVITY STAGE COALESCE FILTER OIL → SLUDGE OCM 0.0 ppm 3-WAY VALVE OVER- BOARD OPEN DIVERT RETURN LINE SEP PRESSURE 0.00 bar SCENARIO: -- Select scenario to begin
ALARM MANAGEMENT
Per MARPOL Annex I Reg.14 — Auto-divert on OCM >15 ppm
ACTIVE ALARMS
LIVE READINGS
Oil Content0.0ppm
Bilge Tank Level0%
Flow Rate0.0m³/h
Sep. Pressure0.0bar
VALVE LINEUP
SUCTION / PROCESS
DISCHARGE
SLUDGE
OCM TREND (ppm)
OIL RECORD BOOK
ORB ENTRIES (Part I)
OWS UNIT — DETAILED P&ID
SYSTEM CONTROLS
BILGE PUMP

PIPELINE COMPONENTS

PROCESS DATA
Flow Rate0.0 m³/h
Inlet Pressure0.00 bar
Sep. Pressure0.00 bar
Oil Content0.0 ppm
Sludge Level0%

VALVE POSITIONS
Bilge SuctionCLOSED
OWS InletCLOSED
OWS OutletCLOSED
OverboardOPEN
Bilge ReturnCLOSED
Sludge DrainCLOSED
GRAVITY SEPARATOR — STAGE 1 INTERNALS
SEPARATOR PARAMETERS
SEPARATION PERFORMANCE
Inlet Oil Conc.-- ppm
Outlet Oil Conc.-- ppm
Separation Eff.-- %
Sludge Rate-- L/h

STAGE 1 — GRAVITY
Chamber Temp-- °C
Residence Time-- min
Oil Layer Depth-- mm
Interface Level-- mm

SLUDGE MANAGEMENT
Sludge Tank Level0 %
Sludge ValveCLOSED

MAINTENANCE INDICATORS
Last Service-- h ago
Plate Pack StatusNORMAL
Emulsion LayerNONE
COALESCING FILTER — STAGE 2 & POLISHING
FILTER PARAMETERS
FILTER ELEMENT STATUS
DP across filter0.00 bar
DP High Alarm0.35 bar
Filter Efficiency-- %
Element Life-- h

COALESCING STAGE
Inlet Oil Content-- ppm
Outlet Oil Content-- ppm
Water Carry-overNONE

BYPASS & MAINTENANCE
Bypass StatusCLOSED

SERVICE HISTORY
No service entries.
OIL CONTENT MONITOR — MEPC.107(49) TYPE APPROVED
OCM CONTROLS
OCM READING
EFFLUENT OIL CONTENT
0.0
ppm
015 ppm25

3-WAY DIVERT VALVE
OVERBOARD
3-WAY VALVE POSITION
Auto-divert Set Point15.0 ppm
Divert Delay2 s
Divert Count (voyage)0

CALIBRATION

INSTRUMENT STATUS
Sensor StatusREADY
Last Zero Cal--:--
Last Span Cal--:--
Cell FoulingNONE
Lamp Hours-- h
OVERBOARD DISCHARGE — MARPOL COMPLIANCE
DISCHARGE CONTROLS
DISCHARGE STATUS
OCM Reading0.0 ppm
Flow Rate0.0 m³/h
Discharge Rate0.0 L/min
3-Way ValveOVERBOARD

VOLUME ACCOUNTING
This Discharge0.000 m³
Total (Voyage)0.000 m³
Bilge Tank Level0 %
Est. Time Remaining-- min

MARPOL CONDITIONS CHECK
En route (≥7 knots)
Outside Special Area
OCM <15 ppm
ORB entry ready

ACTIONS
BILGE SYSTEM — HOLDING TANK & PUMP
BILGE CONTROLS
BILGE HOLDING TANK
Tank Level0 %
Volume0 m³
Capacity10 m³
High-Level Alarm90 %

BILGE PUMP
Pump StatusSTOPPED
Pump Speed0 RPM
Discharge Pressure0.00 bar
Motor Current0.0 A

BILGE WELL INFLOWS
Engine Room Bilge0.0 L/h
Shaft Seal Drain0.0 L/h
Purifier Sludge0.0 L/h
FW Drain Cooler0.0 L/h
Total Inflow0.0 L/h

SUCTION STRAINER
DP across strainer0.00 bar
Strainer StatusCLEAN
CHEMICAL DOSING SYSTEM — DEMULSIFIER & COAGULANT
DOSING CONTROLS
DEMULSIFIER PUMP
Dose Rate0.0 mL/min
Tank Level-- %
Ratio-- ppm

COAGULANT PUMP
Dose Rate0.0 mL/min
Tank Level-- %
Ratio-- ppm

DOSING EFFECT
Pre-dosing OCM-- ppm
Post-dosing OCM-- ppm
Effectiveness-- %

MANUAL DOSE (BOOST)
Injects 5× dose for 30 s — use for high oil content events
ALARM & EVENT LOG
ALARM SUMMARY
ALARM COUNTS
Active Alarms0
Unacknowledged0
Warnings0
Total Events0

SETPOINTS — OCM
Divert Setpoint15.0 ppm
Pre-alarm12.0 ppm
High-high Alarm20.0 ppm

SETPOINTS — BILGE
High Level Alarm90 %
High-High Alarm95 %

SETPOINTS — FILTER
DP High Warning0.30 bar
DP High Alarm0.35 bar

ACTIONS

OIL RECORD BOOK — ENTRY REQUIRED

MARPOL Annex I Reg.17 requires an ORB entry for this discharge operation.

Screen Too Small

This simulator requires a minimum resolution of 980 x 600 px.
Recommended: 1920 x 1080 (16:9) or larger.
Please resize your browser window or use a larger display.