DONNING PROCEDURE
1
Visual check — cylinder pressure ≥270 bar (90%)
2
Don the set — back plate, waist belt, shoulder straps
3
Open cylinder valve — check gauge reads ≥270 bar
4
Check regulator — purge test, hose connections
5
Don facepiece — fit over face, tighten straps
6
Positive pressure test — block exhalation valve
7
Activate PASS device — confirm armed
0/7 steps — Complete donning before entry
SCBA Controls
SCBA STATUS DISPLAY
SCBA STATUS
Live Readings
Cylinder Pressure300bar
O2 (Ambient)20.9%
CO (ppm)0ppm
Cylinder ValveCLOSED
FacepieceNOT DONNED
PASS DeviceDISARMED
Bypass ValveCLOSED
Entry Auth.NO
WAwaiting scenario selection
BUDDY CHECK PANEL
Mutual check before entry — both crew members
Cylinder pressure — both ≥270 bar
Harness buckles secure (both wearers)
Facepiece seal check — no leak
Communication method agreed
Turnaround pressure agreed (150 bar)
PASS devices armed (both)
0/6 buddy checks complete
PROCEDURE LOG
-- SCBA trainer initialised --
PERFORMANCE DATA
Donning Steps Done0/ 7
Air Remaining100%
Cylinder: 6 L @ 300 bar
Capacity: 1,800 L total
Consumption: 40 L/min
Low Press. Alarm: 55 bar
Min Entry Press.: 270 bar (90%)
Scenario: None loaded