Tank Farm Operations - Training Guide ============================================================ MINIMUM RESOLUTION: 980 x 600 px RECOMMENDED: 1920 x 1080 (16:9) or larger SIMULATOR OVERVIEW ---------------------------------------- Tank farm operations simulator covering tank gauging, transfer operations, overfill protection, and vapor recovery per API 2350 and API 650. Standards: API 2350 · API 650 · API 2000 · OSHA PSM INTERFACE LAYOUT ---------------------------------------- - LEFT PANEL: System controls (Start/Stop/ESD/Reset, Mode toggle) - CENTER: P&ID schematic with real-time process visualization - RIGHT PANEL: System gauges, operational checklist, alarm list OPERATING PROCEDURES ---------------------------------------- Step 1: Verify tank gauging operational Step 2: Line up transfer valves Step 3: Open suction and discharge valves Step 4: Start transfer pump Step 5: Monitor source and destination levels Step 6: Verify overfill protection armed Step 7: Complete transfer — stop pump Step 8: Record final gauging readings SCENARIOS ---------------------------------------- Product Transfer: Execute tank-to-tank transfer — line up valves, start pump, monitor levels. Overfill Prevention: Test high-level and high-high-level SIS per API 2350. Blending Operation: Blend two products to target specification using ratio control. ALARM RESPONSE ---------------------------------------- OVERFILL [ALARM]: Tank high-high level — SIS activated LEVEL_HIGH [WARNING]: Tank high level alarm LEAK_DETECT [ALARM]: Leak detection system activated VAPOR_HIGH [WARNING]: Vapor space pressure high PUMP_TRIP [WARNING]: Transfer pump tripped CONTROLS -------- - START: Begin process operation - STOP: Normal shutdown - EMERGENCY STOP: Immediate shutdown of all systems - RESET: Clear ESD condition and reset to standby - TOGGLE MODE: Switch between Manual and Auto control - Fullscreen: Click the fullscreen button in header - EXIT: Return to BlueSim portal - HELP: Opens this training guide