Set 3 of the High Voltage Safety Officer & Switchgear Operations (HV) exit exam bank — 30 of 193 questions, with the correct option marked and a one-line explanation for every one. Read it end to end, jump to a single set, or search it — then sit the same bank as a timed paper. The real DG Shipping exit exam is 30 marks with 15 to pass.
These are the bank's original groupings. Practising deals the whole bank out again every time you reshuffle, so a practice “Set 3” is a different 30 questions each time — the set numbers below are the source file's, and are only used here so the key stays navigable. Options are listed in their original order with fixed letters; when you practise, those move too.
Bank last rebuilt .
30 of 30 shown · Set 3
Nothing in this set matches that. Try a shorter word, or search the whole key.
Set 3 — 30 HV exit exam questions with answers
1. Which document contains the shipyard's description of operations regarding the vessel's High Voltage (HV) equipment?
- A. Preliminary operation manual
- B. High voltage operation manual
- C. Performance manual
- D. Equipment manual
2. A low voltage protection circuit is used in electric motor starting equipment to:
- A. Trip circuit contactor when the motor over-speeds due to low voltage
- B. Trip circuit contactor when the motor develops short circuit due to low voltage
- C. Allow the motor to restart automatically on restoration of voltage without manual resetting
- D. Prevent motor from restarting automatically upon restoration of supply voltage
3. In air blast circuit breakers, the compressed air pressure used for arc quenching is in the order of:
- A. 100 mm Hg
- B. 1 kg/cm²
- C. 20 to 30 kg/cm²
- D. 200 to 300 kg/cm²
4. What is the primary means by which an electrical maintenance worker is protected from electrical hazards while performing work on an electrical circuit?
- A. Shutting down the necessary equipment only
- B. Using personal protective equipment (PPE) alone
- C. Posting safety warning signs
- D. Performing a lockout / tagout (LOTO) and grounding procedure
5. What is the Polarisation Index (PI) in insulation resistance testing?
- A. Ratio of 10-minute insulation resistance to 1-minute insulation resistance
- B. Ratio of 1-minute insulation resistance to 10-minute insulation resistance
- C. Ratio of 5-minute insulation resistance to 25-minute insulation resistance
- D. Ratio of test voltage to leakage current after 1 minute
6. The direction of mechanical force experienced by a current-carrying conductor placed in a magnetic field is determined by:
- A. Fleming's left-hand rule
- B. Fleming's right-hand rule
- C. Helix rule
- D. Corkscrew rule
7. Which of the following insulating media can be used in sphere gaps and high-voltage test setups?
- A. Liquid insulation (e.g., transformer oil)
- B. Solid insulation (e.g., polyester, resin-bonded paper)
- C. Gas insulation (e.g., SF6, N2, CO2, CCl2F2)
- D. Any of the above
8. Cartridge and rewireable fuse protection in general distribution circuits is typically used for continuous current ratings up to:
- A. 10 A
- B. 20 A
- C. 50 A
- D. 100 A
9. Which of the following circuit breakers provides high operating reliability and minimal maintenance requirements?
- A. Air blast circuit breaker
- B. SF6 gas circuit breaker
- C. Vacuum circuit breaker
- D. Bulk oil circuit breaker
10. Which type of work procedure involves electrical installations that are completely de-energized, isolated, proven dead, and earthed?
- A. Live working
- B. Dead working
- C. Working in the vicinity of live parts
- D. Hot line working
11. Following the 2010 Manila Amendments, which regulatory body made High Voltage (HV) system training mandatory for senior engineering staff on vessels with installations above 1,000 V?
- A. SOLAS
- B. STCW
- C. MARPOL
- D. ISPS
12. Air blast circuit breakers are particularly preferred for applications requiring:
- A. Short duty only
- B. Intermittent duty only
- C. Repeated frequent duty
- D. DC traction sub-stations only
13. High-voltage alternating current (AC) arc interruption is primarily achieved through:
- A. High resistance interruption
- B. Low resistance / zero-current interruption
- C. Both A and B
- D. Magnetic attraction only
14. The desired protective tripping operation of a power circuit breaker under fault conditions is:
- A. Manually initiated
- B. Automatically initiated by protective relays
- C. Warning buzzer alarm only
- D. Delayed until watchkeeper reset
15. Lower voltage systems supplied through step-down transformers from high-voltage systems must be protected against overvoltages. This is achieved by:
- A. Direct earthing of the lower voltage system neutral
- B. Appropriate neutral voltage limiters (surge arresters / spark gaps)
- C. Both A and B
- D. Increasing cable insulation thickness only
16. In the arc extinction process using the high resistance method:
- A. Arc resistance is decreased with time
- B. Arc resistance is increased with time
- C. Arc resistance remains strictly constant
- D. Arc resistance is reduced to zero
17. On high-voltage positive polarity conductors at elevated pressures, corona discharge visually appears as a:
- A. Uniform bluish-white glowing sheath
- B. Reddish glowing spot
- C. Uniform greenish spot
- D. Yellow pulsating flame
18. The heat produced at an electrical contact point owing to current flow is least affected by:
- A. Temperature of the surrounding medium
- B. Contact resistance
- C. Magnitude of electric current flowing
- D. Duration of current flow
19. When procedures involve the temporary removal of circuit main earths under a Sanction-to-Test, the earths are secured with working locks. The keys to these locks are:
- A. Retained by the Authorised Person (HV) who removes and replaces the earth as requested
- B. Retained by the Chief Engineer
- C. Retained by the Electro-Technical Officer only
- D. Kept inside the engine control room safety locker
20. What are the primary hazards associated with an Arc Flash event in High Voltage systems?
- A. Sudden release of intense thermal energy, blinding light, and acoustic shockwaves
- B. Severe burns and blast injuries that can be fatal even several meters away
- C. Catastrophic structural equipment destruction and vaporized shrapnel
- D. All of the above
21. Electrical alternating current (AC) power is generated and transmitted at high voltage primarily to:
- A. Safeguard against power theft
- B. Minimise I²R transmission losses and reduce conductor size
- C. Reduce the capital cost of generator construction
- D. Eliminate the need for circuit breakers
22. When two diesel generator sets are running smoothly in parallel on the main switchboard during an engine room watch, what does this condition fundamentally imply?
- A. Both generators have identical terminal voltage, system frequency, and phase sequence
- B. Both diesels carry identical active kW, reactive kVAr, and line amperage at all times
- C. Both diesels are operating at varying unsynchronized rotational speeds
- D. Both generators are operating without voltage regulators
23. In a 3-phase induction motor operating in normal motoring mode, the rotor rotates at a speed that is:
- A. Equal to the synchronous speed of the stator rotating magnetic field
- B. Slightly lower than the synchronous speed of the stator field
- C. Higher than the synchronous speed of the stator field
- D. Completely unrelated to the stator supply frequency
24. For liquid-cooled static frequency converters on electric propulsion vessels, which additional monitoring arrangements must be provided?
- A. Stand-by coolant pump automatic start / alarm
- B. Coolant conductivity monitoring (de-ionized water)
- C. Coolant temperature and flow rate alarms
- D. All of the above
25. Which of the following metals has the highest electrical conductivity at room temperature?
- A. Copper
- B. Aluminium
- C. Silver
- D. Iron
26. In a high-voltage circuit breaker, ionization of the contact gap medium is facilitated by:
- A. Increase in electric field strength across the gap
- B. Increase in mean free path of electrons
- C. High temperature of the surrounding dielectric medium
- D. All of the above
27. If two alternators are operating in parallel synchronism and the excitation voltage of one machine is suddenly increased:
- A. Both machines will trip instantly
- B. The over-excited machine will motorize
- C. Circulating reactive current flows and synchronising torque maintains synchronism
- D. The system frequency increases proportionally
28. When a vessel suffers an unexpected total electrical blackout, what should be the watch engineer's initial priority action?
- A. Notify the Chief Engineer and bridge watch officer immediately while emergency power initiates
- B. Cancel audible alarms and wait for automation reset
- C. Start stripping the oily water separator
- D. Open all high-voltage generator isolators manually
29. What safety precautions must be strictly observed when working on marine High Voltage vessels?
- A. Observing minimum approach distances corresponding to system voltage
- B. Employing approved Permit to Work (PTW) and switching procedures
- C. Using certified high-voltage PPE, face shields, and insulated tools
- D. All of the above
30. Power loss due to corona discharge on an overhead transmission line is directly proportional to:
- A. Radius of conductor
- B. Supply frequency (f + 25)
- C. Spacing between conductors
- D. Dielectric constant of air