TASCO exit exam questions and answers — Set 4
Set 4 of the Advanced Training for Oil Tanker Cargo Operations (TASCO) exit exam bank — 30 of 181 questions, with the correct option marked and a one-line explanation for every one. Read it end to end, jump to a single set, or search it — then sit the same bank as a timed paper. The real DG Shipping exit exam is 30 marks with 15 to pass.
These are the bank's original groupings. Practising deals the whole bank out again every time you reshuffle, so a practice “Set 3” is a different 30 questions each time — the set numbers below are the source file's, and are only used here so the key stays navigable. Options are listed in their original order with fixed letters; when you practise, those move too.
Bank last rebuilt .
30 of 30 shown · Set 4
Nothing in this set matches that. Try a shorter word, or search the whole key.
Set 4 — 30 TASCO exit exam questions with answers
1. When did Annex VI take effect?
- A. May 19, 2005
- B. February 25, 1997
- C. October 12, 1991
- D. July 3, 2015
2. The extent of MARPOL compliance is determined by:
- A. Vessel flag, type and age
- B. Vessel type, size and speed
- C. Vessel type, size and age
- D. Vessel type, size and crew
3. MARPOL applies to:
- A. tankers greater than 150GT and cargo ships greater than 400GT
- B. applies to all ships, oil platforms, barges and private yachts and hydrofoils
- C. applies to all ships, oil platforms, barges and private yachts and hovercrafts
- D. applies to all ships, oil platforms, barges and private yachts
4. When you have completed bunkering operations, the hoses should be ___________ .
- A. steam cleaned and flushed with hot water
- B. stowed with their ends open for venting
- C. drained into drip pans or tanks
- D. blown down with inert gas
5. What is the most important regulatory requirement for the master arriving at the lightering position?
- A. Factors considered in designating lightering zones.
- B. Lightering of Oil and Hazardous Material Cargoes Pre-arrival notices.
- C. Reporting of incidents.
- D. Designation of lightering zones.
6. Most minor spills of oil products are caused by
- A. equipment failure
- B. major casualties
- C. human error
- D. unforeseeable circumstances
7. Containment and Damage Control: identify which step is of the highest importance for personal protection?
- A. Don required PPE as determined from the MSDS.
- B. Shut off or otherwise stem the spill at the source.
- C. Contain liquid material using barriers, such as absorbents, rags or other equipment suitable to dam the flow.
- D. Fight fire (if any), being careful to use firefighting methods compatible with the material involved.
8. What is used to incinerate solid and liquid wastes arising from the operation of the ship?
- A. ISM Screen
- B. Oily water separation
- C. Fire Sprinkler Cleaner
- D. Incinerator
9. The Volatile Organic Compound (cargo vapor) Management Plan is required on what type of vessel?
- A. Container vessels
- B. Ro-ro vessels
- C. Tank sensors
- D. Crude Oil Carriers
10. Your vessel is carrying 24,000 barrels (3816 cubic metres) of oil for discharge. The cargo hoses have an inside diameter of eight inches. The container around the loading manifold must hold
- A. four barrels
- B. eight barrels
- C. six barrels
- D. three barrels
11. It is generally NOT allowed to clean up an oil spill by using ___________ .
- A. boom
- B. chemical agents
- C. skimmers
- D. suction equipment
12. The total quantity of oil discharged at sea on new tankers must not exceed:
- A. 1/15000 of the total quantity of that particular cargo of which the residue formed part
- B. 1/30000 of the total quantity of that particular cargo of which the residue formed part
- C. 1/25000 of the total quantity of that particular cargo of which the residue formed part
- D. 1/2000 of the total quantity of that particular cargo of which the residue formed part
13. A starting interlock in the ODME ensures
- A. stops discharge of the oil effluent when the oil content exceeds 5 part per million
- B. prevents malfunctioning of the system
- C. that an alarm is given off when the system malfunctions
- D. the monitoring equipment is fully operational before commencing the discharge of the oil effluent at sea
14. A gas venting system on a tanker that has gas lines in each tank connected to a common gas main running the full length of the ship is called:
- A. gas-main system
- B. An independent system
- C. common-main system
- D. vent-main system
15. The inert gas is delivered to the cargo tanks by an inert gas deck main line. Find the correct labelling for the deck equipment items.
- A. 1-Cargo tank valves; 2- Pressure/Vacuum Valve; 3- Mast Riser; 4-Isolating Valve
- B. 1-Pressure/Vacuum Valve; 2- Cargo tank valves; 3- Mast Riser; 4-Isolating Valve
- C. 1-Mast Riser; 2-Isolating Valve; 3-Cargo tank valves; 4- Pressure/Vacuum Valve
- D. 1-Isolating Valve; 2- Pressure/Vacuum Valve; 3- Mast Riser; 4-Cargo tank valves
16. Pneumatically Operating Valve; what is the most critical component for correct valve operation, based on your shipboard experience of running such a system?
- A. Valve stem
- B. The valve springs
- C. The Diaphragm
- D. Valve orifice
17. Advantages of using inert gas, pick one that is the main reason for its application,
- A. Reduces corrosion.
- B. Voyage cleaning of tanks is unnecessary.
- C. No explosive mixtures can form in the tank.
- D. Reduces pumping time because of positive pressure in the tanks.
18. The total capacity of the slop tank or tanks should be not less than what percentage of the oil-carrying capacity of the vessel?
- A. 3%
- B. 7%
- C. 5%
- D. 10%
19. Acidic solutions are formed in cargo tanks of tankers
- A. when sulphur compounds in oil cargoes react with hydrocarbon gas
- B. when sulphur compounds in oil cargoes react with oxygen
- C. when sulphur compounds in oil cargoes react with water
- D. when sulphur compounds in oil cargoes react with chemicals
20. Tank level measurement of free water by gauging tape and plumb bob: find the labeling combination that is correct,
- A. 1 Water Innage; 2-Water Cut; 3- Water Cut; 4- Water Ullage
- B. 1- Water Cut; 2- Water Cut; 3- Water Innage; 4- Water Ullage
- C. 1- Water Cut; 2- Water Innage; 3- Water Cut; 4- Water Ullage
- D. 1- Water Cut; 2- Water Innage; 3- Water Ullage; 4- Water Cut
21. An inert gas generator burns what oil to generate inert gas?
- A. Heavy oil
- B. Diesel oil
- C. Gas oil
- D. Crude oil
22. Back flow of inert gas is prevented by:
- A. valve provided in the scrubber
- B. The deck water seal
- C. An isolating valve
- D. The deck mechanical non-return valve
23. Tank coating requirements developed by IMO are applicable to
- A. new crude oil tankers of 5000 GRT and above
- B. new crude oil tankers of 5000 DWT and above
- C. new crude oil tankers of 500 GRT and above
- D. new crude oil tankers of 500 DWT and above
24. A deepwell pump is a type of ___________ .
- A. centrifugal pump
- B. gear pump
- C. eductor
- D. screw pump
25. Bottom washing:
- A. is not effective when carrying a small quantity of refined products
- B. will remove heavy wax sediments at the tank bottom
- C. is done to remove traces of the previous cargo
- D. cannot be done with chemical solvents
26. An inert gas system is required to be fitted:
- A. On crude oil tankers of above 20,000 tonnes deadweight
- B. On chemical tankers of above 20,000 tonnes deadweight
- C. On all tankers of above 20,000 tonnes deadweight
- D. On product tankers of above 20,000 tonnes deadweight
27. Centrifugal pumps are otherwise known as
- A. Hydro-dynamic pumps
- B. Reciprocating pumps
- C. Positive displacement pumps
- D. Gravity pumps
28. The ring main pipeline system is extensively used on:
- A. VLCCs
- B. Crude oil tankers
- C. Product carriers
- D. Medium range tankers
29. Class B fires are caused by
- A. electricity
- B. flammable gases
- C. flammable liquids
- D. combustible solids
30. Use of Pressure-Vacuum (PV) Relief Valve; label the diagram correctly:
- A. 1-Deck Isolating Valve; 2- IG Main; 3- Vent Main; 4- By-Pass Valve; 5- Tank Isolating Valve; 6- PV valve
- B. 1-Deck Isolating Valve; 2- Vent Main; 3- IG Main; 4- By-Pass Valve; 5- PV valve; 6- Tank Isolating Valve
- C. 1-IG Main; 2-Deck Isolating Valve; 3- Vent Main; 4- By-Pass Valve; 5- PV valve; 6- Tank Isolating Valve
- D. 1-Deck Isolating Valve; 2- IG Main; 3- Vent Main; 4- By-Pass Valve; 5- PV valve; 6- Tank Isolating Valve
Printing this? Use your browser's Print (Ctrl/⌘ + P) — the buttons, the search box and the site chrome drop out and the questions run on as plain text, so a set fits a few pages. Filter to one set first if you only want that set on paper.